Developer Updates July 2022
July 7, 2022
Developer Update: July 2022
Shuffleboard court: The railings will be installed this month; followed closely by bench install. The parking lot area around the court will also be adjusted to accommodate two handicapped spaces.
We continue curb and storm drain repairs on Harlequin / Whistling Duck / Champions Dr. and are hopeful that surface paving on Champions Drive will occur in Fall of this year (2022).
Golf Range: A golf net will be installed along the right side of the golf range behind the homes that back up to the range on Winged Foot Drive.
Argall Street: Construction continues as some residents begin to move in.
6 lots – This is near Discovery Center on Heritage Shores Circle: Lot development should begin this summer. This will allow us to final surface pave Heritage Shores Circle in this vicinity as well.